HUAWEI BTS 3606 PDF

All the outdoor units including BTSAC and RRU comply with either With Huawei latest CDMA BTS products, based upon the physical. Widely deployed in Reliance’s network, Huawei’s BTS AC-R is designed to handle high temperatures and power failures in India. Find solutions to your huawei bts question. Get free help, tips & support from top experts on huawei bts related issues.

Author: Yohn Shall
Country: Liberia
Language: English (Spanish)
Genre: Medical
Published (Last): 20 October 2010
Pages: 81
PDF File Size: 1.38 Mb
ePub File Size: 4.25 Mb
ISBN: 577-4-77254-207-5
Downloads: 16549
Price: Free* [*Free Regsitration Required]
Uploader: Fenrira

Chapter 1 Installation Preparations 1.

Ahmed has 6 jobs listed on their profile. Enter text from picture: Other Cables The power cable and the grounding cable 306 routed straight and bundled neatly. The following table shows the specifications of the BTS Table 2: Tighten the bolts on the cover.

HUAWEI BTS INSTALLATION MANUAL Pdf Download.

Joseph has 4 jobs listed on their profile. If the outer package is damaged or soaked; or the equipment is soaked and becomes rusty, stop unpacking and find the cause. Installing Other Functional Modules Normally, the fan box is installed upon delivery. Place the support below the antistatic floor.

Huawei cdma bts Administration Building, Huawei Technologies Co. The letters A, B, C as shown in Figure are not cable labels. A seasoned and dynamic telecom professional with 17 year working experience in telecom industry. Procedure To prepare power cables, proceed as follows Keeping proper record and check and balance on all sub-contractors for dismantling.

New Drivers  ETOLOGIA FELINA PDF

View Shafir Salam K A. That is, 1 m 39 in. Its advanced features include priority call, call hold, late entry, dynamic grouping, and fallback mode. Munir has 2 jobs listed on their profile. Other products from this supplier. The last section also explains how to install cabinet assemblies on the cement floor without sufficient bearing capacity.

Mohamed El Amine has 1 job listed on their profile. Figure Installing a board 2 Tighten the screws clockwise on the front panel, as shown in Figure To avoid damaging equipment inside, do not apply too much force. Remove four bolts and one gasket that connect the antistatic floor and the support.

CDMA grows greener

Diagonally fasten them to a 45 N-m in-lbas shown in Figure Muhammad Waleed menyenaraikan 6 pekerjaan pada profil mereka. Page 70 – Distributing Protection Grounding Cables Reposnsible for Technical documentation and conducting PAT as well.

In addition, the DBS provides outstanding performance for traditional trunking with a group call setup time less bgs ms and a pre-emptive priority call time less than ms. Insert the boards according to the names on the relevant nameplates to avoid any mistake. Shiraz has 3 jobs listed on their profile. Have a deep knowledge in telecommunication guawei different sector. Wide frequency band availability simplifies network deployment and allows the system to adapt to various frequency policies with higher flexibility.

Uzual cand nu e aglomeratie un speedtest imi arata Mbps.

Got it, continue to print. Mustapha tiene 4 empleos en su perfil. The DBS includes two basic types of modules: Tighten the bolts at the front face of the cabinet. Procedure To carry out the power-on check of power module, proceed as follows: To print the manual completely, please, download it. Huzwei, the fan box is installed upon delivery.

New Drivers  EL CODIGO MAYA BARBARA HAND CLOW EBOOK

All Rights Reserved No part of this manual may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co. If the digital power and amplifier power are normal, the antenna feeder may be connected abnormally.

Note, Comment, Tip, Knowhow, Thought: The BTS in the multi-channel mode does not support the power synthesis function. When handling the cabinet, hold on the solid places such as the upper cable rack or bone frame. Lihat profil lengkap di LinkedIn dan terokai kenalan dan pekerjaan Muhammad Waleed di syarikat yang serupa.

Huasuda Place of Origin: If the power supply is on during the operation, do not touch the binding posts with the adjustable wrench or the screwdriver. The product will soon be reviewed by our informers. Paint the whole support with rustproof coat and top-coat. A wide variety of cdma base station options are available to you, such as paid samples, free samples.

Don’t show me this message again.